MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
Marcos inspects rock shed project in Benguet, This news data comes from:http://www.jyxingfa.com
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.

Marcos inspects rock shed project in Benguet
- DoTr seeks higher budget for 2026, requests P531B amid cuts
- No winner in lotto draws for Aug 30
- Marcos mum on Magalong joining independent commission for DPWH probe
- Emma Tiglao crowned Miss Grand PH 2025
- No winner in Grand, Megalotto draws for Aug 27
- House panel defers 2026 DPWH budget until agency submit changes
- UN: Rising heat 'severely' impacting workers' health
- What to know about Indonesia's nationwide unrest over lawmakers' perks
- Go seeks more support for Filipino athletes
- PH, Australia, Canada hold joint sea drills